    I don't know why you guys are moaning about this. The problem isn't the architecture or the construction crew/equipments. The problem is the budget. Why is there a budget problem? Because the clubs are mostly owned by the government. Why are the clubs are mostly owned by the government? Because on average 70% of a club's income comes from TV rights and Iranian TV is run by the government cheapskates who refuse to pay the clubs. Therefore there's absolutely no financial incentive for private investors to come into play. Ergo, you'll end up w/ projects such as Naghshe Jahan that needs congressional approval for its annual budget and by now you should understand how the IR bureaucracy works. I'd be surprised if it gets done in this decade.

    Comment


      Almost looks the same as Azadi stadium..nothing special about it.

      Comment


        Originally posted by MiyamotoMusashi View Post
        I don't know why you guys are moaning about this. The problem isn't the architecture or the construction crew/equipments. The problem is the budget. Why is there a budget problem? Because the clubs are mostly owned by the government. Why are the clubs are mostly owned by the government? Because on average 70% of a club's income comes from TV rights and Iranian TV is run by the government cheapskates who refuse to pay the clubs. Therefore there's absolutely no financial incentive for private investors to come into play. Ergo, you'll end up w/ projects such as Naghshe Jahan that needs congressional approval for its annual budget and by now you should understand how the IR bureaucracy works. I'd be surprised if it gets done in this decade.
        actually the owner od the stadium is the municpality, the municipality is run by ....., and all they do is steal, there is enough money but so little gets left for actually building stuff
        IRAN, SARVARE SARVARAN

        Comment


          Foolad's stadium pictures:
          http://www.jahankowsar.com/%DA%AF%D8...3/Default.aspx

          Comment


            ^^^ pretty cool... thats if we lived in 1970's or 80's :P

            Comment


              edited.. wrong thread
              Last edited by webmaster; 11-23-2012, 09:22 PM.
              __________________________________________________ ________________________________________
              We accept the reality of the world with which we are presented

              __________________________________________________ ________________________________________

              Comment


                wow sorry but some of u are so unrealistic

                firstly this is the stadium thread for esfahan , not ahvaz


                and for gods sake foolad is not manchester united , the stadium they are building has 30000 capacity and it PERFECT AND STILL A BIT BIG

                u think foolad can get 30000 to watch their games EVERY WEEK? OFCOURSE NOT, pp and ss dont even get that many, some the teams in england and germany and france etc dont have such big stadiums


                THINK A BIT


                and for that person who said this is for the 80s , NO ITS NOT, have u seen the renders? NO, u guys can only complain sometimes u complain when there actually isnt a need to , this will in infact be the only proper , PRIVATE FOOTBALL ONLY STADIUM IN ALL OF IRAN
                it has a pretty modern design, reminds me a bit of hamburgs arena

                i will post the renders and newer pics on the appropriate thread, which is this
                http://www.persianfootball.com/forum...r-construction
                IRAN, SARVARE SARVARAN

                Comment


                  اگر پول بدهند تاپايان سال ورزشگاه نقش جهان راتحويل مي دهيم

                  2 شهريور 1388 ساعت 15:12

                  پيمانکار ورزشگاه نقش جهان اصفهان گفت: چنانچه اعتبار لازم براي تکميل اين ورزشگاه هر چه سريعتر تامين شود، آمادگي تحويل آن تا پايان امسال وجود دارد.


                  --------------------------------------------------------------------------------

                  "محمد معروفي" در گفت وگو با ايرنا با اشاره به خواست مسوولان استان براي تکميل ورزشگاه نقش جهان تا پايان سال جاري، مهمترين مشکل را کمبود اعتبار دانست و افزود: امسال فقط 40 درصد اعتبار لازم تامين شده است.

                  وي اظهار داشت:* پيشرفت هر طرحي نيازمند تامين تجهيزات و ماشين آلات، نيروي انساني متخصص و اعتبارات پيش بيني شده است که در خصوص ورزشگاه نقش جهان، شرکت "کاشالوت" به عنوان پيمانکار کنوني اين پروژه بيش از آنچه که اين مجموعه نياز دارد، ماشين آلات و نيروي انساني متخصص در اختيار دارد اما براي اجراي عمليات، اعتبار لازم در اختيار پيمانکار قرار نگرفته است.

                  وي با اشاره به اينکه هر روز تاخير در اجراي برنامه هاي اين طرح خسارت زيادي متوجه پيمانکار مي کند، افزود: با شش کارخانه براي تامين تجهيزات اين ورزشگاه قرارداد بسته ايم اما تحويل آنها مستلزم پرداخت وجه مي باشد که تاکنون تامين نشده است.
                  معروفي اظهار داشت: مجري براساس امکانات و ماشين آلاتي که در اختيار دارد، زمان مشخص و معمول را به عنوان زمان پايان کار اعلام مي کند اما چنانچه کارفرما خواستار کاهش اين زمان باشد بايد شرايط آن را نيز براي پيمانکار بوجود آورد که متاسفانه اين شرايط از سوي کارفرما فراهم نشده است.
                  وي اخبار انتشار يافته طي هفته هاي اخير از سوي برخي رسانه ها را يک طرفه و جهت دار دانست و افزود:* اين اخبار بدون مطالعه و کار کارشناسي منتشر شد و از نظر اهالي فن و دست اندرکاران پروژه ورزشگاه نقش جهان بي پايه و اساس است.
                  وي خاطرنشان کرد: خبرنگاران امانت دار جامعه هستند و جهت گيري هاي يک طرفه و احساسي برخي از آنان در شان رسانه ها نيست.

                  پيمانکار ورزشگاه نيمه تمام نقش جهان با بيان اينکه "اين ورزشگاه يک طرح ملي است و طراحي انجام شده در آن در سطح کشور و حتي خاورميانه بي نظير است"، افزود:* براساس طراحي ، نقش جهان اصفهان تنها استاديوم استاندارد و مسقف ايران است و ورزشگاه هايي که در استان هاي ديگر کشور در حال اجراست، خصوصيات ورزشگاه نقش جهان را ندارد.
                  وي با اشاره به اينکه "* طول کنسول هيچيک از ورزشگاه هاي درحال ساخت کشور به اندازه ورزشگاه نقش جهان اصفهان نيست " ، تصريح کرد: طول سايبان هاي ورزشگاه هاي درحال ساخت کشور چيزي در حدود 15 تا 17 متر است اما طول سايه بان ورزشگاه نقش جهان 30 متر و بدون تعبيه ستون است.
                  معروفي يادآور شد:* در طراحي نماي اين ورزشگاه ، ستون هاي آن به شکل ستون هاي "سي و سه پل" و "پل خواجو" و نمادي از هنر معماري اصفهان لحاظ شده است.
                  وي گفت: در خاورميانه استاديومي با اين مشخصه و ابهت وجود ندارد و اگر پروژه بدون کم و کاست تکميل شود ، خدمت بزرگي به نسل هاي آتي و جامعه ورزش بخصوص اصفهان انجام شده است.
                  معروفي در پاسخ به اين پرسش ايرنا که تربيت بدني اصفهان شما را در تاخير اين پروژه مقصر معرفي کرده است، اظهار داشت:* مقابل افراد غيرمسوول دفاعياتي ندارم ، اظهارنظرهاي انجام شده نيز واقعيت ندارد زيرا تربيت بدني استان در اين پروژه هيچ نقشي ندارد.
                  وي با اشاره به ضرورت وجود ابزار کار و تامين امکانات و اعتبار لازم براي پيشبرد هر پروژه اي گفت: مشکل ورزشگاه نقش جهان فني نيست بلکه کمبود اعتبار مالي است.
                  معروفي در ادامه به ساخت ورزشگاه " کپتاين " آفريقاي جنوبي براي جام جهاني 2010 اشاره کرد و افزود: ساخت اين ورزشگاه که ظرفيت آن 56 هزار نفر است و از ورزشگاه نقش جهان کوچک تر مي باشد ، نزديک به چهار سال و نيم طول کشيده است.
                  وي درباره پيشرفت فيزيکي نقش جهان در مراحل اول و دوم گفت: کار در مرحله اول به مراتب خيلي راحت تر از مرحله دوم بود زيرا در مرحله اول سازه هاي بتوني بکارگيري شده است اما در مرحله دوم که ما تحويل گرفتيم سازه هاي فلزي بايد در ارتفاع نصب شود و نصب آنها به سادگي انجام نمي شود.
                  پيمانکار ورزشگاه نقش جهان زمان در نظر گرفته شده اوليه براي تکميل اين طرح را اول مرداد سال 86 اعلام کرد و افزود: فاز دوم اين پروژه در دو سال گذشته 65 درصد پيشرفت داشته و اين ميزان پيشرفت به طور معمول به 40 ماه زمان نياز داشت.
                  وي به تلاش هاي استاندار اصفهان براي حل مشکلات اين پروژه اشاره کرد و گفت: *در جلسه اي که 24 تير ماه سال گذشته با حضور استاندار برگزار شد، وي از شرکت هاي فولاد مبارکه و ذوب آهن خواست تا اين پروژه را ياري دهند.
                  معروفي ادامه داد: پس از اين نشست مديرکل تربيت بدني استان در گفت وگو با خبرنگاران اظهارنظرهايي کرد که واقعيت نداشت.
                  پيمانکار نقش جهان توضيح داد: مديرکل تربيت بدني اصفهان گفته بود که ذوب آهن ، فولاد مبارکه ، شهرداري و استانداري هريک پنج ميليارد تومان براي ساخت اين پروژه کمک کردند درحالي که اينگونه نبود.
                  وي در توضيح تلاش هاي استاندار اصفهان براي کمک به اين پروژه گفت: آقاي بختياري شرکت هاي فولاد مبارکه و ذوب آهن را براي ياري رساندن به پروژه ورزشگاه نيمه تمام نقش جهان فراخواند و در طي سه جلسه پياپي قرار شد که آهن آلاتي که در تعهد ما نبود و درتعهد کارفرما است را از اين دو کارخانه بصورت عرف خريداري کنيم.
                  وي گفت: ذوب آهن و فولاد مبارکه فروش خود را به اين پروژه انجام دادند و به جاي پولشان چک يک ساله دريافت کرده و به ازاي هر ماه تاخير در پرداخت مبالغ خود نيز يک درصد سود پيش بيني کردند.
                  معروفي تصريح کرد: *البته آنها کار بزرگي کردند زيرا در سيستم دولتي تعهد قبول کردن خطرناک است.
                  وي افزود: تاکنون پروژه ورزشگاه نقش جهان رقمي بالغ بر 40 ميليارد ريال از فولاد مبارکه و بالغ بر 20 ميليارد ريال از ذوب آهن تجهيزات خريداري کرده که هفته گذشته 20 ميليارد ريال از تعهدات خود را به فولاد مبارکه و 10 ميليارد ريال را به ذوب آهن پرداخت کرديم و نيمي از تعهدات به اين دو کارخانه تسويه شد.
                  پيمانکار ورزشگاه نقش جهان اضافه کرد: به احتمال زياد در شهريورماه جاري مابقي تعهدات خود را به شرکت هاي ياد شده پرداخت خواهيم کرد و بنابراين هيچ نهاد و يا شخصي به اين پروژه کمک بلاعوض نکرده است و حتي کمک هايي که از طريق کارخانه هاي فولاد مبارکه و ذوب آهن اصفهان به اين پروژه انجام شد به صورت قرض الحسنه نبود.
                  وي يادآور شد: تمامي خبرهايي که در طي اين مدت مبني بر کمک 50 ميليارد ريالي شهرداري، 50 ميليارد ريالي فولاد مبارکه، 50 ميليارد ريالي ذوب آهن و 50 ميليارد ريالي استانداري اصفهان به پروژه نقش جهان منتشر شد، نادرست است.
                  معروفي با اشاره به اينکه اسناد کليه مبالغ موجود است، گفت: فولاد مبارکه و ذوب آهن اصفهان حتي در قراردادشان به صراحت ذکر کردند، به ازاي هر يک ماه تاخير در پرداخت وجه مصالح فروخته شده يک درصد سود دريافت خواهند کرد.
                  هرچند پيمانکار ورزشگاه نقش جهان در گفت وگو با خبرنگار ايرنا از مشخص کردن اعتبار لازم براي اين پروژه طفره رفت اما معاون عمراني استانداري اصفهان 19 مردادماه در گفت وگو با خبرنگار ايرنا در خصوص عدم تکميل به موقع اين ورزشگاه گفت: مشکلات اين طرح به صورت هفتگي از سوي مسوولان استان پيگيري مي شود و به منظور بستر سازي براي تکميل هرچه سريعتر آن، سه ميليارد ريال مطالبات پيمانکار پرداخت شده است.
                  "محمد جعفر عليزاده" افزود: اعتبار امسال اين پروژه 85 ميليارد ريال است که براي تکميل آن حدود 100ميليارد ريال ديگر نياز است.
                  همچنين مديرکل تربيت بدني استان اصفهان روز شنبه گذشته در جريان بازديد اعضاي شوراي اسلامي شهر اصفهان از اين پروژه با اشاره به برگزاري آخرين جلسه با پيمانکار و مدير شرکت تجهيز و توسعه سازمان تربيت بدني اظهار داشت: در اين جلسه که يک ماه قبل برگزار شد، پيمانکار ورزشگاه نقش جهان مقصر شناخته و مقرر شد اگر اين روند استمرار يابد پيمانکار تغيير کند.
                  "غلامرضا شيران " با اشاره به تاخير در روند اجرايي پروژه توسط پيمانکار افزود: براي تسريع در عمليات ساخت ورزشگاه نيمه تمام نقش جهان مايل هستيم تا يکي از شرکت هاي اصفهاني پيمانکاري اين ورزشگاه را بر عهده گيرد.
                  مديرکل تربيت بدني استان اصفهان افزود: پيمانکار کنوني ورزشگاه نقش جهان مبلغ چهار ميليارد ريال طلب دارد که اين مبلغ آماده پرداخت است.
                  ورزشگاه بزرگ اصفهان به وسعت يک هزار و يکصد هکتار در شمال شهر تاريخي اصفهان در سال 1370 اولين بار با تصويب طرح جامع منطقه اصفهان در اين ساختار قرار گرفت و سپس بامطرح شدن موضوع ،طرح احداث ورزشگاه بزرگ اصفهان در صحن مجلس شوراي اسلامي موجوديت قانوني يافت.
                  بر اساس مصوبه مجلس شوراي اسلامي سيصد هکتار از فضاي يکهزار و 100 هکتاري موجود به فضاي ورزشي اختصاص يافت و مابقي به عنوان فضاهاي فرهنگي و فضاي سبز تصويب شد.
                  ساخت اين ورزشگاه با نام نقش جهان در سال 1371 آغاز شد.
                  طراحي استاديوم فوتبال نقش جهان به صورت بيضي شکل است و در دوطبقه احداث خواهد شد.
                  ظرفيت طبقه اول آن 42 هزار نفر و طبقه دوم آن 33 هزار نفر است.
                  استاديوم بر روي پلاتفرم به ابعاد 300*350 و مساحت کل آن 103 هزار و 250 متر مربع مي باشد.

                  Comment


                    ^^The bold part says the columns will mirror the Khadjoo bridge and will represent Isfahan's historic architecture.

                    Comment


                      The article is from 3 years ago but I posted it in response to people who said it looks like old communist country's stadiums. Evidently it has a touch of the local architecture. Perhaps our architects and civil engineers on the board can comment.

                      Comment


                        ^^ it wont, it will be a rather contemporary design, as seen in the renders

                        its fine though , if they misuse historical elements it can look very very tacky and cheap

                        simple is best
                        IRAN, SARVARE SARVARAN

                        Comment


                          Originally posted by Sorkhabi View Post
                          wow sorry but some of u are so unrealistic

                          firstly this is the stadium thread for esfahan , not ahvaz


                          and for gods sake foolad is not manchester united , the stadium they are building has 30000 capacity and it PERFECT AND STILL A BIT BIG

                          u think foolad can get 30000 to watch their games EVERY WEEK? OFCOURSE NOT, pp and ss dont even get that many, some the teams in england and germany and france etc dont have such big stadiums


                          THINK A BIT


                          and for that person who said this is for the 80s , NO ITS NOT, have u seen the renders? NO, u guys can only complain sometimes u complain when there actually isnt a need to , this will in infact be the only proper , PRIVATE FOOTBALL ONLY STADIUM IN ALL OF IRAN
                          it has a pretty modern design, reminds me a bit of hamburgs arena

                          i will post the renders and newer pics on the appropriate thread, which is this
                          http://www.persianfootball.com/forum...r-construction
                          you are right, why build large stadium when you know you wouldn't be having large spectators, BUT at least build something more modern looking. even if the stadium is only going to have 1000 seats. Ahavz gets really hot, why not build something that will help the fans to stay cool and keep the pitch cool for the players

                          Comment


                            for once I would like to see a thread opened up for a completed stadium. One that is finished, and ready to go ....
                            “It is easier to fool the people, than to convince them they have been fooled." - Mark Twain

                            Comment


                              Originally posted by Ghormeh Sabzi View Post
                              you are right, why build large stadium when you know you wouldn't be having large spectators, BUT at least build something more modern looking. even if the stadium is only going to have 1000 seats. Ahavz gets really hot, why not build something that will help the fans to stay cool and keep the pitch cool for the players
                              foolad is not real madrid of qatar or anything, do you know the immense cost and technological need to cool a stadium and pitch?
                              besides, almost no teams even the most advanced in the world own stadiums of such capacities to cool the area, so i really dont see a need

                              the most logical method is to play at night, in the summer


                              and most of the season is in winter so its fine
                              IRAN, SARVARE SARVARAN

                              Comment


                                Originally posted by kia View Post
                                اگر پول بدهند تاپايان سال ورزشگاه نقش جهان راتحويل مي دهيم

                                2 شهريور 1388 ساعت 15:12

                                پيمانکار ورزشگاه نقش جهان اصفهان گفت: چنانچه اعتبار لازم براي تکميل اين ورزشگاه هر چه سريعتر تامين شود، آمادگي تحويل آن تا پايان امسال وجود دارد.


                                --------------------------------------------------------------------------------

                                "محمد معروفي" در گفت وگو با ايرنا با اشاره به خواست مسوولان استان براي تکميل ورزشگاه نقش جهان تا پايان سال جاري، مهمترين مشکل را کمبود اعتبار دانست و افزود: امسال فقط 40 درصد اعتبار لازم تامين شده است.

                                وي اظهار داشت:* پيشرفت هر طرحي نيازمند تامين تجهيزات و ماشين آلات، نيروي انساني متخصص و اعتبارات پيش بيني شده است که در خصوص ورزشگاه نقش جهان، شرکت "کاشالوت" به عنوان پيمانکار کنوني اين پروژه بيش از آنچه که اين مجموعه نياز دارد، ماشين آلات و نيروي انساني متخصص در اختيار دارد اما براي اجراي عمليات، اعتبار لازم در اختيار پيمانکار قرار نگرفته است.

                                وي با اشاره به اينکه هر روز تاخير در اجراي برنامه هاي اين طرح خسارت زيادي متوجه پيمانکار مي کند، افزود: با شش کارخانه براي تامين تجهيزات اين ورزشگاه قرارداد بسته ايم اما تحويل آنها مستلزم پرداخت وجه مي باشد که تاکنون تامين نشده است.
                                معروفي اظهار داشت: مجري براساس امکانات و ماشين آلاتي که در اختيار دارد، زمان مشخص و معمول را به عنوان زمان پايان کار اعلام مي کند اما چنانچه کارفرما خواستار کاهش اين زمان باشد بايد شرايط آن را نيز براي پيمانکار بوجود آورد که متاسفانه اين شرايط از سوي کارفرما فراهم نشده است.
                                وي اخبار انتشار يافته طي هفته هاي اخير از سوي برخي رسانه ها را يک طرفه و جهت دار دانست و افزود:* اين اخبار بدون مطالعه و کار کارشناسي منتشر شد و از نظر اهالي فن و دست اندرکاران پروژه ورزشگاه نقش جهان بي پايه و اساس است.
                                وي خاطرنشان کرد: خبرنگاران امانت دار جامعه هستند و جهت گيري هاي يک طرفه و احساسي برخي از آنان در شان رسانه ها نيست.

                                پيمانکار ورزشگاه نيمه تمام نقش جهان با بيان اينکه "اين ورزشگاه يک طرح ملي است و طراحي انجام شده در آن در سطح کشور و حتي خاورميانه بي نظير است"، افزود:* براساس طراحي ، نقش جهان اصفهان تنها استاديوم استاندارد و مسقف ايران است و ورزشگاه هايي که در استان هاي ديگر کشور در حال اجراست، خصوصيات ورزشگاه نقش جهان را ندارد.
                                وي با اشاره به اينکه "* طول کنسول هيچيک از ورزشگاه هاي درحال ساخت کشور به اندازه ورزشگاه نقش جهان اصفهان نيست " ، تصريح کرد: طول سايبان هاي ورزشگاه هاي درحال ساخت کشور چيزي در حدود 15 تا 17 متر است اما طول سايه بان ورزشگاه نقش جهان 30 متر و بدون تعبيه ستون است.
                                معروفي يادآور شد:* در طراحي نماي اين ورزشگاه ، ستون هاي آن به شکل ستون هاي "سي و سه پل" و "پل خواجو" و نمادي از هنر معماري اصفهان لحاظ شده است.
                                وي گفت: در خاورميانه استاديومي با اين مشخصه و ابهت وجود ندارد و اگر پروژه بدون کم و کاست تکميل شود ، خدمت بزرگي به نسل هاي آتي و جامعه ورزش بخصوص اصفهان انجام شده است.
                                معروفي در پاسخ به اين پرسش ايرنا که تربيت بدني اصفهان شما را در تاخير اين پروژه مقصر معرفي کرده است، اظهار داشت:* مقابل افراد غيرمسوول دفاعياتي ندارم ، اظهارنظرهاي انجام شده نيز واقعيت ندارد زيرا تربيت بدني استان در اين پروژه هيچ نقشي ندارد.
                                وي با اشاره به ضرورت وجود ابزار کار و تامين امکانات و اعتبار لازم براي پيشبرد هر پروژه اي گفت: مشکل ورزشگاه نقش جهان فني نيست بلکه کمبود اعتبار مالي است.
                                معروفي در ادامه به ساخت ورزشگاه " کپتاين " آفريقاي جنوبي براي جام جهاني 2010 اشاره کرد و افزود: ساخت اين ورزشگاه که ظرفيت آن 56 هزار نفر است و از ورزشگاه نقش جهان کوچک تر مي باشد ، نزديک به چهار سال و نيم طول کشيده است.
                                وي درباره پيشرفت فيزيکي نقش جهان در مراحل اول و دوم گفت: کار در مرحله اول به مراتب خيلي راحت تر از مرحله دوم بود زيرا در مرحله اول سازه هاي بتوني بکارگيري شده است اما در مرحله دوم که ما تحويل گرفتيم سازه هاي فلزي بايد در ارتفاع نصب شود و نصب آنها به سادگي انجام نمي شود.
                                پيمانکار ورزشگاه نقش جهان زمان در نظر گرفته شده اوليه براي تکميل اين طرح را اول مرداد سال 86 اعلام کرد و افزود: فاز دوم اين پروژه در دو سال گذشته 65 درصد پيشرفت داشته و اين ميزان پيشرفت به طور معمول به 40 ماه زمان نياز داشت.
                                وي به تلاش هاي استاندار اصفهان براي حل مشکلات اين پروژه اشاره کرد و گفت: *در جلسه اي که 24 تير ماه سال گذشته با حضور استاندار برگزار شد، وي از شرکت هاي فولاد مبارکه و ذوب آهن خواست تا اين پروژه را ياري دهند.
                                معروفي ادامه داد: پس از اين نشست مديرکل تربيت بدني استان در گفت وگو با خبرنگاران اظهارنظرهايي کرد که واقعيت نداشت.
                                پيمانکار نقش جهان توضيح داد: مديرکل تربيت بدني اصفهان گفته بود که ذوب آهن ، فولاد مبارکه ، شهرداري و استانداري هريک پنج ميليارد تومان براي ساخت اين پروژه کمک کردند درحالي که اينگونه نبود.
                                وي در توضيح تلاش هاي استاندار اصفهان براي کمک به اين پروژه گفت: آقاي بختياري شرکت هاي فولاد مبارکه و ذوب آهن را براي ياري رساندن به پروژه ورزشگاه نيمه تمام نقش جهان فراخواند و در طي سه جلسه پياپي قرار شد که آهن آلاتي که در تعهد ما نبود و درتعهد کارفرما است را از اين دو کارخانه بصورت عرف خريداري کنيم.
                                وي گفت: ذوب آهن و فولاد مبارکه فروش خود را به اين پروژه انجام دادند و به جاي پولشان چک يک ساله دريافت کرده و به ازاي هر ماه تاخير در پرداخت مبالغ خود نيز يک درصد سود پيش بيني کردند.
                                معروفي تصريح کرد: *البته آنها کار بزرگي کردند زيرا در سيستم دولتي تعهد قبول کردن خطرناک است.
                                وي افزود: تاکنون پروژه ورزشگاه نقش جهان رقمي بالغ بر 40 ميليارد ريال از فولاد مبارکه و بالغ بر 20 ميليارد ريال از ذوب آهن تجهيزات خريداري کرده که هفته گذشته 20 ميليارد ريال از تعهدات خود را به فولاد مبارکه و 10 ميليارد ريال را به ذوب آهن پرداخت کرديم و نيمي از تعهدات به اين دو کارخانه تسويه شد.
                                پيمانکار ورزشگاه نقش جهان اضافه کرد: به احتمال زياد در شهريورماه جاري مابقي تعهدات خود را به شرکت هاي ياد شده پرداخت خواهيم کرد و بنابراين هيچ نهاد و يا شخصي به اين پروژه کمک بلاعوض نکرده است و حتي کمک هايي که از طريق کارخانه هاي فولاد مبارکه و ذوب آهن اصفهان به اين پروژه انجام شد به صورت قرض الحسنه نبود.
                                وي يادآور شد: تمامي خبرهايي که در طي اين مدت مبني بر کمک 50 ميليارد ريالي شهرداري، 50 ميليارد ريالي فولاد مبارکه، 50 ميليارد ريالي ذوب آهن و 50 ميليارد ريالي استانداري اصفهان به پروژه نقش جهان منتشر شد، نادرست است.
                                معروفي با اشاره به اينکه اسناد کليه مبالغ موجود است، گفت: فولاد مبارکه و ذوب آهن اصفهان حتي در قراردادشان به صراحت ذکر کردند، به ازاي هر يک ماه تاخير در پرداخت وجه مصالح فروخته شده يک درصد سود دريافت خواهند کرد.
                                هرچند پيمانکار ورزشگاه نقش جهان در گفت وگو با خبرنگار ايرنا از مشخص کردن اعتبار لازم براي اين پروژه طفره رفت اما معاون عمراني استانداري اصفهان 19 مردادماه در گفت وگو با خبرنگار ايرنا در خصوص عدم تکميل به موقع اين ورزشگاه گفت: مشکلات اين طرح به صورت هفتگي از سوي مسوولان استان پيگيري مي شود و به منظور بستر سازي براي تکميل هرچه سريعتر آن، سه ميليارد ريال مطالبات پيمانکار پرداخت شده است.
                                "محمد جعفر عليزاده" افزود: اعتبار امسال اين پروژه 85 ميليارد ريال است که براي تکميل آن حدود 100ميليارد ريال ديگر نياز است.
                                همچنين مديرکل تربيت بدني استان اصفهان روز شنبه گذشته در جريان بازديد اعضاي شوراي اسلامي شهر اصفهان از اين پروژه با اشاره به برگزاري آخرين جلسه با پيمانکار و مدير شرکت تجهيز و توسعه سازمان تربيت بدني اظهار داشت: در اين جلسه که يک ماه قبل برگزار شد، پيمانکار ورزشگاه نقش جهان مقصر شناخته و مقرر شد اگر اين روند استمرار يابد پيمانکار تغيير کند.
                                "غلامرضا شيران " با اشاره به تاخير در روند اجرايي پروژه توسط پيمانکار افزود: براي تسريع در عمليات ساخت ورزشگاه نيمه تمام نقش جهان مايل هستيم تا يکي از شرکت هاي اصفهاني پيمانکاري اين ورزشگاه را بر عهده گيرد.
                                مديرکل تربيت بدني استان اصفهان افزود: پيمانکار کنوني ورزشگاه نقش جهان مبلغ چهار ميليارد ريال طلب دارد که اين مبلغ آماده پرداخت است.
                                ورزشگاه بزرگ اصفهان به وسعت يک هزار و يکصد هکتار در شمال شهر تاريخي اصفهان در سال 1370 اولين بار با تصويب طرح جامع منطقه اصفهان در اين ساختار قرار گرفت و سپس بامطرح شدن موضوع ،طرح احداث ورزشگاه بزرگ اصفهان در صحن مجلس شوراي اسلامي موجوديت قانوني يافت.
                                بر اساس مصوبه مجلس شوراي اسلامي سيصد هکتار از فضاي يکهزار و 100 هکتاري موجود به فضاي ورزشي اختصاص يافت و مابقي به عنوان فضاهاي فرهنگي و فضاي سبز تصويب شد.
                                ساخت اين ورزشگاه با نام نقش جهان در سال 1371 آغاز شد.
                                طراحي استاديوم فوتبال نقش جهان به صورت بيضي شکل است و در دوطبقه احداث خواهد شد.
                                ظرفيت طبقه اول آن 42 هزار نفر و طبقه دوم آن 33 هزار نفر است.
                                استاديوم بر روي پلاتفرم به ابعاد 300*350 و مساحت کل آن 103 هزار و 250 متر مربع مي باشد.
                                this is a huge disaster and a fine example on how "bi daro peykar" our country is. this stadium has been in building for 20-years lol with tears. the budget of this construction has been altered and augmented god knows how many times and it is still not finished. if this is not embezzlement then i dont know what is. this is a huge joke and builders of this project or the people supplying the funds should be arrested and jailed immediately. when i was in iran a few years ago one thing that really pissed me off was the numerous unfinished projects in almost every street. for example you go to a very nice street with beautiful stone side walks but in many places you notice that in many places the stone side walk has been left unfinished and it is just dirt or it has been finished with a different stone not matching the rest. this destroys the whole purpose of spending such money on labor and materials. no one in iran seems to care not the government nor the people! here i have construction on many occasions and i will not pay unless the work is finished and or to my full satisfaction. you pay 25 percent at the beginning then the rest when the work is finished! you put deadlines that have to be met then you put clauses that will state what will happen if the work is not finished on time. it is not hard.
                                Last edited by hzv; 11-26-2012, 11:57 AM.